Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13654541

- Product Categories
- Friendly Links
- home > Supply > Glass flake epoxy paint | epoxy glass flake anti-corrosion coatings | glass flake epoxy paint factory
Glass flake epoxy paint | epoxy glass flake anti-corrosion coatings | glass flake epoxy paint factory
Information Name: | Glass flake epoxy paint | epoxy glass flake anti-corrosion coatings | glass flake epoxy paint factory |
Published: | 2015-02-07 |
Validity: | 360 |
Specifications: | 20 kg / barrel |
Quantity: | 200000.00 |
Price Description: | |
Detailed Product Description: | [Product composition] Senta epoxy glass flake epoxy asphalt series is made of epoxy paint, coal tar pitch, glass flakes, pigments, additives, solvents, curing agent components. [Main Features] glass flake epoxy asphalt paint has excellent water resistance, excellent chemical resistance properties and excellent adhesion. [Uses] asphalt glass flake epoxy paint applied to locomotives, anticorrosive chemical equipment, steel grade concrete surfaces, particularly suitable for use underground and underwater facilities or the inner wall of heavy-duty equipment. Brown-black color appearance] [[Basic Parameters 1. Theoretical amount: 2 to 4 m / kg 2. Dry Film Thickness: 80 ~ 125μm 3. Drying time: ≦ 4h (table) ≦ 24h (real) [Packing] 20kg / barrel [construction] time 8h, (25 ℃) [Surface Treatment] painted a solid base to achieve a clean, grease-free of all dirt, dust, etc., apply the base surface without acids, bases or moisture condensation, use sandpaper to fight hair after before they can finish, after painting, cement wall applications closed, re-construction primer, paint; Metallic recommend applying a matte varnish. [Coating Method] airless spray, air spray, roller / brush. [Storage period] store in a cool, dry, well-ventilated place, paint a year. [Note] 1. Pre-construction first read the instructions; before 2. Stir the paint, need reinforcement agent ratio adjusted as required, how much with how much stir used within eight hours spent ; 3. the construction process to keep dry and clean, non-contact with water, acids, alcohols, bases, etc.; with paint hardener drums must Gaiyan avoid gelling; 4. during construction and dry, shall not exceed 85% relative humidity, Immediately after the coating must be 7 days before delivery. |
Admin>>>
You are the 6156 visitor
Copyright © GuangDong ICP No. 10089450, Senta Zhengzhou Chemical Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6156 visitor
Copyright © GuangDong ICP No. 10089450, Senta Zhengzhou Chemical Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility