Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13654541

- Product Categories
- Friendly Links
Information Name: | Epoxy paint | Epoxy primer | Epoxy anticorrosive paint manufacturer |
Published: | 2015-02-07 |
Validity: | 360 |
Specifications: | 20 kg / barrel |
Quantity: | 200000.00 |
Price Description: | |
Detailed Product Description: | Epoxy paint is mainly composed of: by special epoxy resin, polyamide resin, fillers, additives, solvents and other components mixed. The main performance epoxy primer: epoxy primer with good mechanical properties, tough film, good impact resistance. Excellent solvent resistance and chemical resistance. Good penetration resistance. Room temperature curing, fast drying, with the end of all types, intermediate coat and topcoat. Lower grade requirements for rust, rust and other characteristics can be manually. [Uses] apply to the epoxy primer after blasting or sandblasting steel primer for maintenance, but also for the use of anti-rust primer, widely used in steel structures, bridges, industrial machinery. The main index] Color: iron red, gray and other colors. [Description] applied the method of construction: High-pressure airless spray, air spray, brush and roller. [] Two-component mixing ratio of the main agent A: curing agent B = 20: 4 (weight ratio) [time] aging [30min] Epoxy thinner thinner surface treatment】 【surface to be coated to remove dirt, oil and other impurities ; steel surface sand blasting or mechanical descaling. [Condition] Construction Painting temperature range 10 ℃ ~ 35 ℃, relative humidity below 85%. Rain, snow, wind and other inclement weather a large, open-air painting is not. After matching] [epoxy coatings, CSM paint, chlorinated rubber paint, alkyd coatings, high chlorinated polyethylene coatings, polyurethane coatings. 【Storage】 This product should be stored in a cool, dry, ventilated warehouse. This product storage period of 12 months. Over the storage period of the product can still be used after passing inspection. [Security] during coating operations, you must take all precautions to prevent accidents and construction personnel necessary personal protection. Paint all the ingredients and the construction site is strictly prohibited sources of ignition, and maintain good ventilation, poorly ventilated environment should use forced ventilation. Paint construction workers must wear protective equipment to prevent inhalation of mist, hurt eyes, skin. Spillage on the skin should immediately wash with soap and water, splashing into the eyes, rinse immediately with plenty of water, and then look for a medical examination. When the paint on fire, do not fire water. Use foam, carbon dioxide or dry powder fire extinguishers put out the flames. |
Admin>>>
You are the 6156 visitor
Copyright © GuangDong ICP No. 10089450, Senta Zhengzhou Chemical Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6156 visitor
Copyright © GuangDong ICP No. 10089450, Senta Zhengzhou Chemical Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility